Inspection And General Installation Requirements For Suspended Platform Of Building Hanging Basket
作者:Huake Construction Hanging Basket 阅读:1470
    There Are Many Kinds Of Hanging Baskets, Such As Electric Hanging Baskets, Building Hanging Baskets, High-altitude Work Hanging Baskets, Etc., And The Following Is For The Construction Hanging Baskets, To Explain The Relevant Knowledge, So That You Can Have The Learning Content, And Then, You Can Constantly Get Familiar With And Understand The Construction Hanging Baskets, So As To Achieve The Overall Level As Soon As Possible, And At The Same Time, You Can Realize The Correct And Standard Operation Of The Basket.   &1. The Horizontal Distance Between The Building Basket And The Building &Generally Speaking, The Horizontal Distance Between The Building Basket And The Building Is Not More Than 20cm. As For The Reference Standard Of This Regulation, It Is The Standard Of "technical Code For Safety Of Construction Tool Scaffold". Therefore, This Regulation Shall Be Strictly Implemented And Shall Not Violate The Regulations.   &2. Inspection Of Suspended Platform In Building Basket   &The Safety Guardrail Of The Suspended Platform Shall Be Intact And Complete, And Shall Have Web Members. In Addition, The Height Of Guardrail, If It Is On One Side Of The Building, Shall Not Be Less Than 0.8m, And The Height Of The Other Three Surfaces Shall Not Be Less Than 1.1m. Moreover, The Safety Guardrail Shall Be Able To Bear The Concentrated Load Of 1000N Horizontal Movement. &For The Bottom Plate Of The Hanging Platform Of The Building Basket, Anti-skid Measures And Drainage Work Shall Be Done Well. Moreover, There Should Be Baffle Around It, The Height Of Baffle Should Not Be Less Than 150 Mm, And The Gap Between Baffle And Base Plate Should Not Be More Than 5 Mm. In Addition, On The Side Close To The Building, Wall Wheel, Guide Wheel And Buffer Device Shall Also Be Installed.   &3. General Installation Requirements For Building Cradles   &Nbsp; & Nbsp; (1) The Installation Of The Basket Shall Be Carried Out In Accordance With The Special Construction Scheme And Guided By Professionals To Avoid Incorrect Installation. &Before Installing The Hanging Basket Of The Building, The Safety Area Should Be Demarcated First, And Check Whether There Is Any Operation Obstacle, If Any, It Should Be Eliminated In Time. After That, The Fasteners, Connectors And Some Important Parts In The Basket Shall Be Inspected To See If They Are Loose Or Fall Off, If They Can Be Used Normally, And If There Are Problems, They Shall Be Solved In Time. &In The Process Of Installation, If The Construction Basket Needs To Use Accessories, It Should Be The Same Manufacturer As The Basket, Not Different Manufacturers, So As To Prevent It From Mismatching With The Basket, And Then, In The Process Of Use, Problems Will Affect The Installation Of The Basket. In Addition, If There Are High-voltage Transmission Lines Within The Scope Of Operation, Necessary Isolation Measures Shall Be Taken.  
Home
Company
Honor
Partner
Case
Video
News
Company information
Industry dynamic
Q&A
Products
Construction hoist
Material elevator
Construction lifting platform
Electric basket
Contact
Contact
Feedback
Wuxi Huake Machine Equipment Co., Ltd
Add:No. 120 jiaoyang road, yangjian industrial park, xishan district, wuxi
Code: 214107
E-mail:sales@china-tdt.com
Sales department:tel: 86-0510-88782152