Welcome to the official website of Wuxi Huake Machinery Equipment Co., Ltd.!
导航
Hotline:86-0510-88782152
×
What Is The Tension Mechanism Under The Elevator
作者:Admin 阅读:1008
Today, Xiaobian Specially Collected Some Relevant Information About The Hoist On The Internet. Through The Introduction Of The Lower Tension Mechanism Of The Hoist, I Hope To Give Some Guidance And Suggestions To Friends Who Want To Buy The Hoist! In Life, We Need Constant Learning And Discovery, And Only With Our Joint Efforts Can We Realize The Great Development Of Our Country. The Following Experts Analyze A Hoist Used In Asphalt Mixture Mixing Equipment, Specifically A Tension Mechanism At The Bottom Of The Hoist. According To The Technical Scheme Provided By The Utility Model, The Tension Mechanism At The Lower Part Of The Elevator Includes The Left Side Plate, The Right Side Plate And The Driven Shaft Installed Between The Left Side Plate And The Right Side Plate, Which Is Characterized In That: The Left Movable Plate Is Bolted With The Movable Plate Fixing Bolts, And The Right Movable Plate Is Bolted With The Movable Plate Fixing Bolts; The Two Ends Of The Driven Shaft Are Connected With The Bearings The Left Movable Plate And The Right Movable Plate; The Left Movable Plate And The Right Movable Plate Are Provided With Vertical Oblong Adjusting Holes; The Left Screw Nut Mechanism Is Arranged On The Left Plate, The Right Screw Nut Mechanism Is Arranged On The Right Plate, The End Of The Adjusting Screw Of The Left Screw Nut Mechanism Is Rotationally Connected With The Left Movable Plate, And The End Of The Adjusting Screw Of The Right Screw Nut Mechanism Is Rotationally Connected With The Right Movable Plate 。 The Utility Model Tightens The Chain By Adjusting The Screw Rod, Which Can Effectively Adjust The Tension Degree Of The Chain. In Many Years Of Experience, We Know That The Maintenance Methods Of Hoist Working Wire Rope And Safety Wire Rope Let Us Play To The Maximum. First Of All, The Working Wire Rope And Safety Wire Rope Are The Main Components To Bear The Load Of The Hoist, So There Are Strict Requirements For The Wire Rope Used. In Order To Prevent The Rope Head From Being Loose And Easy To Penetrate Into The Elevator And The Safety Lock, After The Steel Wire Rope Is Cut Off According To The Selected Length, Both Ends Of The Rope Are Specially Processed, And The Penetrating End Is Welded And Then Repaired Into A Bullet Shaped Cone.
Home
Company
Honor
Partner
Case
Video
News
Company information
Industry dynamic
Q&A
Products
Construction hoist
Material elevator
Construction lifting platform
Electric basket
Contact
Contact
Feedback
Wuxi Huake Machine Equipment Co., Ltd
Add:No. 120 jiaoyang road, yangjian industrial park, xishan district, wuxi
Code: 214107
E-mail:sales@china-tdt.com
Sales department:tel: 86-0510-88782152