Welcome to the official website of Wuxi Huake Machinery Equipment Co., Ltd.!
导航
Hotline:86-0510-88782152
×
How To Install And Adjust The Suspension Mechanism Of The Basket?
作者:Admin 阅读:1044
In Fact, Many Friends Have Seen And Used The Basket, But How Should We Install And Adjust The Hanging Mechanism Of The Basket? Let's Analyze It In Detail. 1. The Installation Floor Shall Be Horizontal. In Case Of Inclined Surface, It Shall Be Reliably Leveled Under The Angle Wheel. If The Installation Surface Is Waterproof And Thermal Insulation Layer, 2.5cm-3cm Thick Wood Plate Shall Be Padded Under The Front And Back Seats To Prevent Crushing The Waterproof And Thermal Insulation Layer. 2. The Height Of The Adjustable Suspension Support Shall Be Such That The Lower Side Of The Front Beam Is Slightly Higher Than The Height Of The Parapet (or Other Obstacles). If Possible, After The Positioning Of The Suspension Mechanism, The Lower Side Of The Extended End Of The Front Beam Shall Be Fixed With The Parapet With Wood Blocks. 3. The Rated Adjustment Range Of The Overhang Length Of The Extension End Of The Front Beam Is 0.3-1.5m. When The Rated Overhang Length Is Exceeded, Reliable Strengthening Measures And Rated Working Load Must Be Taken, And They Can Only Be Used After Being Confirmed By The Responsible Department. 4. The Distance Between The Front And Rear Seats Shall Be Adjusted To A Large Distance As Far As Possible When The Site Allows. 5. The Distance Between The Two Supports Shall Be Adjusted To The Distance Between The Suspension Ends Of The Front Beam Which Is 3-5cm Shorter Than The Length Of The Suspension Platform. 6. When The Steel Wire Rope Is Tensioned, The Front Beam Shall Be Slightly Upwarped By 3 ~ 5cm To Produce Prestress And Improve The Steel Degree Of The Front Beam. 7. When The Steel Wire Rope Is Clamped, The Number Of Rope Clamps Shall Not Be Less Than 3, And The U-shaped Opening Shall Be Opposite To The End Of The Steel Wire Rope With The Same Direction. The Rope Clamp Shall Be Clamped Successively From The Hoisting Point, And The Steel Wire Rope Shall Be Slightly Arched Between The Latter And The Former. When The Rope Clamp Nut Is Tightened, The Wire Rope Clamp Shall Be Flat To 1 / 2 ~ 1 / 3 Diameter. 8. When The Steel Wire Rope Is Laid Vertically, The Free Disc Of The Steel Wire Rope Shall Be Placed On The Floor, The Rope Head Shall Be Carefully Drawn Out, And Then It Shall Slide Down Slowly Along The Front, And It Is Forbidden To Throw The Steel Wire Rope Into A Disc And Down. After The Steel Wire Rope Is Put Out, The Tangled Rope Shall Be Carefully Separated And Pressed, And The Redundant Steel Wire Rope On The Ground Shall Be Carefully Coiled And Tied, And Shall Not Be Placed On The Ground Randomly.
Home
Company
Honor
Partner
Case
Video
News
Company information
Industry dynamic
Q&A
Products
Construction hoist
Material elevator
Construction lifting platform
Electric basket
Contact
Contact
Feedback
Wuxi Huake Machine Equipment Co., Ltd
Add:No. 120 jiaoyang road, yangjian industrial park, xishan district, wuxi
Code: 214107
E-mail:sales@china-tdt.com
Sales department:tel: 86-0510-88782152