What Are The Necessary Inspection Tests For The Basket?
作者:Admin
阅读:1039
About The Content Of The Basket, Today's Editor Will Continue, Because There Are Still Many Unknown To Us, So We Should Continue To Learn And Understand, So That We Can Better Understand The Basket, So That We Can Fully Grasp Its Relevant Knowledge. And For Us, This Is Also A Very Good Opportunity To Increase Our Knowledge And Enrich Our Knowledge.
After The Basket Is Installed, It Also Needs To Be Checked And Tested So As To Check Whether There Is Any Problem. Only When There Is No Problem Can It Be Used. So What Should We Do? Let's Talk About It.
The Inspection And Test After The Basket Installation Are As Follows:
(1) The Installation Of The Low Roof Mechanism Shall Be Checked To See Whether It Is Well Matched, Whether The Anchoring Is Reliable And Whether The Connection Mode Is Correct.
(2) Whether The Steel Wire Rope Is Twisted, Squeezed, Worn Or Loose, And Whether The Hanging And Winding Methods Are Correct.
(3) Whether The Safety Protection Device In The Mechanism Is Complete, Complete, Safe And Reliable, Whether The Motor Is Abnormal, And Whether Its Braking Is Reliable.
(4) The Test Of The Basket Is Generally Static Overload Test And Dynamic Overload Test, Mainly To Check Whether The Lifting Is Normal And Whether The Limit Device Is Sensitive And Reliable.
Before Operation, The Basket Also Needs To Be Inspected, Mainly Including:
(1) Whether The Roof Mechanism, Suspended Load And Steel Wire Rope Meet The Requirements, Whether The Power Supply Voltage And Mechanical Equipment Are Normal, And Whether The Safety Protection Device Is Complete And Reliable, Etc. If There Is Any Problem, It Shall Be Handled In Time.
(2) Whether The Basket Has Good Grounding Treatment And Whether There Is No Sundry In The Basket. It Is Strictly Prohibited To Overload The Basket.