Welcome to the official website of Wuxi Huake Machinery Equipment Co., Ltd.!
导航
Hotline:86-0510-88782152
×
Do You Know What To Pay Attention To When Repairing And Cleaning The External Wall Of The Electric Basket?
作者:Admin 阅读:1116
We Often Go To The Electric Hanging Basket Place Is The Construction Site And High-rise Building, So What Do They Do With The Building Hanging Basket? Generally, It Is Used To Repair And Clean The Exterior Wall Of The Building. Because Of The Certain Danger Of Such Work, It Is All Operated By Professionals. They Said That As Long As It Is Carried Out In Accordance With The Norms, There Will Generally Be No Problem. Let's Talk About What We Need To Pay Attention To In The Process Of External Wall Repair. As We All Know, The Electric Hanging Basket Is The Necessary Equipment For The Construction Of High-rise Buildings, So Its Safety Is The First Issue To Be Considered. On The Ground, We Are Going To Check Whether The Joint Of The Electric Horn, The Electric Wall Basket, The Angle Die And The Wall Mold Is Closely Combined. If Not, We Should Use Foam Sponge To Fill The Gaps. Because Once There Is A Gap, There Will Be Leakage, Wrong Platform And Other Phenomena. In Addition, The Through Wall Bolts Shall Be Installed, And The Electric Basket And Foundation Lead Screw Shall Be Adjusted To Keep Them Symmetrical. Make Sure That The Electric Basket Is Straight With The Help Of The Auxiliary Line Of The Formwork, Hang The Wire To Adjust The Upper Opening Of The Electric Basket, And Then Tighten The Foundation Lead Screw And The Through Wall Bolt To Check Whether They Are Firm. During Installation, According To The Sequence Principle Of First Transverse Wall And Then Longitudinal Wall, Hoist The Electric Basket To The Fixed Position According To The Number And Sequence, And Adjust The Electric Basket To The Proper Position According To The Wall Line With Crowbar. If It Is To Install The Electric Basket Outside The Outer Wall, It Is Necessary To First Place The Electric Basket On The Metal Triangular Channel Frame, And Then Fasten And Proofread It With Bolts. As Above, Pay Attention To Check Whether The Joint Of Construction Joint Is Tight And Firm. Before Erecting The Formwork In The Elevator Shaft, The Operation Channel Shall Be Hoisted To The Elevator Shaft, And The Keel Distance Is Generally Less Than 600 Mm. After The Position Is Determined, It Can Be Welded And Fixed. Pave The Plank And Adjust The Four Corners To Ensure That The Channel Is In A Horizontal State. Remember? These Are What We Should Pay Special Attention To When We Use The Electric Hanging Basket To Repair And Clean The Exterior Wall. Don't Underestimate These Contents. If We Neglect Them, The Consequences May Be Very Serious.
Home
Company
Honor
Partner
Case
Video
News
Company information
Industry dynamic
Q&A
Products
Construction hoist
Material elevator
Construction lifting platform
Electric basket
Contact
Contact
Feedback
Wuxi Huake Machine Equipment Co., Ltd
Add:No. 120 jiaoyang road, yangjian industrial park, xishan district, wuxi
Code: 214107
E-mail:sales@china-tdt.com
Sales department:tel: 86-0510-88782152