Application Requirements And Installation Of Construction Basket
作者:Admin
阅读:4077
Before Using The Construction Hanging Basket, It Is Necessary To Carefully Check Whether The Connecting Pieces And Fasteners Are Firmly Installed And Whether The Overhanging Length Of The Cantilever Beam Meets The Use Requirements. The Steel Wire Rope Can Only Be Installed After The Installation Of The Roof Supporting System Of The Electric Basket. It Is Required That The Safety Wire Rope Is On The Outside And The Working Wire Rope Is On The Inside. The Distance Between The Two Ropes Is About 150 Mm, And The Wire Rope Shall Be Fixed And Clamped Tightly.
Whether The Quantity Of Construction Basket And Counterweight Meets The Use Requirements.
① One Side Of The Roof Support System Of The Electric Basket Is Moving Laterally.
② The Other Side Of The Roof Supporting System Of The Electric Basket Is In The Transverse Movement.
The Construction Basket Is Assembled Near The Site, Transported To The Designated Position After Inspection, And Then Connected To The Power Supply For Commissioning. At The Same Time, The Working Wire Rope And The Safety Wire Rope Are Respectively Inserted Into The Lifting Mechanism And The Safety Lock From The Upper Part. The Working Wire Rope Must Be Inserted During The Operation Of The Hoist. When Connecting The Power Supply, Pay Attention To The Phase To Make The Basket Rise And Fall In The Correct Direction.
How To Inspect The Construction Basket Applied In The Construction Basket?
1. The Roof Mechanism, Suspended Load And Steel Wire Rope Meet The Requirements.
2. There Are No Sundries In The Electric Basket And Overload Is Strictly Prohibited.
3. The Mechanical Equipment Is Normal, And The Safety Protection Device Is Complete And Reliable.
4. When Using The Hanging Basket For Electric Welding, The Hanging Basket And Steel Wire Rope Must Be Fully Protected And Shall Not Be Used As The Wiring Circuit.
5. The Power Supply Voltage Shall Be Normal And The Grounding (neutral) Protection Shall Be Good.
6. After Startup, The Operation Test Of The Lifting Basket Shall Be Carried Out, And The Operation Can Be Started Only After It Is Confirmed To Be Normal.
7. After Operation, The Electric Basket Shall Be Cleaned, Hung 3M From The Ground, Cut Off The Power Supply And Remove The Ladder.
8. In Case Of Abnormal Operation During Operation, Stop The Machine Immediately And Take Safety Protection Measures. It Shall Not Be Used Until It Is Inspected And Repaired By Professional Personnel.
Before Using The Construction Hanging Basket, It Is Necessary To Carefully Check Whether The Connecting Pieces And Fasteners Are Firmly Installed And Whether The Overhanging Length Of The Cantilever Beam Meets The Use Requirements.